Delivering utility-scale solar generation with integrated battery storage
Market
Energy & Renewables
Key Services
Construction
Preconstruction
Self-Perform
Delivery Method
Engineer-Procure-ConstructCapacity
216 MWThe challenge
The Winchester Solar 1 & 2 Project required the construction of a 216 MW, utility-scale solar generation facility and the associated power collection system. The project integrated civil, structural, mechanical, and electrical infrastructure to efficiently collect and deliver clean energy, supporting a reliable, resilient, and sustainable electrical grid.

Key Facts
Power generation for approximately 49,000 homes
Challenge met
Through full engineering, procurement, and construction (EPC) delivery, the project integrates site development, foundations, photovoltaic arrays, electrical collection and distribution systems, monitoring and controls, and commissioning into one coordinated solution. Together, these systems maximize energy production and deliver reliable renewable power to the substation, supporting a resilient and sustainable electrical grid.